Holden's Engineering Logo
+44 1772 621010
info@holdensengineering.co.uk
  • Home
  • Our Services
    • Engineering
      • Engineering Companies
      • Engineering Companies Lancashire
      • Bridge Engineering
      • Vehicle Engineering
    • Fabrication
      • Heavy Fabrication
      • Plate Work
      • Stainless Steel Fabrication
      • Welding Services
      • Prefabricated Pipe Work
    • Pre-packaged Plant Rooms
    • Plant & Process Engineering
      • Fork Lift Repairs & Modifications
      • Lifting Applications
      • Plant Manufacturing
      • Plant Modifications
      • Reach Stacker Modifications
      • Specialist Bespoke Engineering
      • Structures
      • Turnkey Projects
      • Weighing System Modifications
    • Pressure Vessels
      • Pressure Vessel Testing
      • Pressure Vessel Inspections
      • Pressure Vessel Design
      • Pressure Vessel Fabrication
      • Pressure Vessel Installation
    • Pipe Fabricators
      • Prefabricated Pipe Work
    • Machining
    • Site Services
    • Valves
  • Sectors
    • Aerospace Engineering UK
    • Chemical Processing UK
    • Drinks & Brewing
    • Food Processing
    • General Manufacturing
    • Hazardous Areas
    • Health and Hospitals
    • Railway
    • Recycling and Waste Management
    • Nuclear and Power
    • Oil and Gas
    • Paper and Pulp
    • Public Sector
    • Pharmaceutical
  • About Us
  • Portfolio
  • Quality Assurance
  • News
  • Contact Us
+44 1772 621010

News

Home
Holden's News
Work Begins on Thai-Chinese Railway Link
Holden's News
9 years ago
Holden's CVE Limited

Work Begins on Thai-Chinese Railway Link

Construction of a railway line that will connect Thailand, China and Laos is underway, after engineering work began earlier this week.

Reuters has reported that a ceremony took place in Nakhon Ratchasima in Thailand on December 21st to commemorate the launch of the line, which is expected to be 873 km long when completed.

Speaking at the event, prime minister Prayuth Chan-ocha said: “Thailand is developing in every aspect to become the centre of connectivity… and this route is to connect to Cambodia, Laos, Myanmar and Vietnam to China, India and further to other countries.”

The first section of the railway will stretch 3.5 km and is expected to take six months to complete.

By 2021, a 250-km high-speed rail line will be operational, connecting Bangkok with Nakhon Ratchasima.

However, it is not known when the full line – linking Thailand in the northern city of Nong Khai to Laos – will be complete.

The initiative is part of the Belt and Road project, intending to connect China to other areas of the world. It hopes to link China to southeast and central Asia by land, and the Middle East and Europe by sea.

New and exciting railway projects are happening all over the world, and just this month the steepest funicular railway opened in Switzerland.

The Stoos Bahn cost £40 million and took 14 years to build. However, it has received great commendation, as it travels at ten miles a second and at gradients of up to 110 per cent, the Independent reported.

If you want more information about railway engineering projects in the UK, see what Holden’s can do for you.

Next Post
World Aerospace Industry Set for Expansion
Previous Post
World’s Steepest Railway Opens in Switzerland!

Related Posts

Holden's News

A Detailed Look at Industrial Pipework Systems and Their Importance

8 December 2025
digital@piranha-solutions.com
Pipework forms the backbone of many industrial processes. It transports steam, water, chemicals, air and product flow across sites that…
Read more
Holden's News

How Coded Welding Supports Industrial Safety and System Reliability

12 November 2025
digital@piranha-solutions.com
Coded welding is a critical skill within industrial engineering. It demands formal qualification, strict process control and continuous attention to…
Read more

Latest News

A Detailed Look at Industrial Pipework Systems and Their Importance

8 December 2025

How Coded Welding Supports Industrial Safety and System Reliability

12 November 2025

The Importance of Precision Fabrication in Modern Engineering

15 October 2025

Pressure Tank Design

9 September 2025

Vertical Pressure Tanks

13 August 2025

What Factors Influence Pressure Vessel Design

15 July 2025

Post Categories

  • Holden's News

Post Archives

  • December 2025
  • November 2025
  • October 2025
  • September 2025
  • August 2025
  • July 2025
  • June 2025
  • August 2024
  • June 2019
  • May 2019
  • March 2019
  • November 2018
  • September 2018
  • August 2018
  • July 2018
  • June 2018
  • May 2018
  • April 2018
  • March 2018
  • February 2018
  • January 2018
  • December 2017
  • August 2016

Now you’ve seen what we can do…

Get in Touch
Accreditations
ISOQAR icon
Safecontractor logo
RISQS logo
CHAS logo
CE logo
Testimonials

We have used Holden’s as our main mechanical contractor for over 30 years.  Being a chemical manufacturer it is very important that any contracting company working on site has full knowledge of all current HSE and Environmental requirements and we have always found Holden’s to be very diligent in this area.  I would have no hesitation in recommending Holden’s to any company that require the services they have to offer.

Barrie Simmonds
Works Director
Chemical Innovations Limited

Preston Pharmaceuticals Production Unit is part of the Royal Preston Hospital.  Holden’s have always given us a first class service, offering advice from their very knowledgeable and friendly staff.  The equipment is machined to a very high standard, turnover and delivery is quick and efficient.

Adam Fleming
Production Manager
Preston Pharmaceuticals

Having developed a great working relationship with Les and his team over the past 3 years, I have no hesitation in recommending them to anyone who looks for a company with a highly professional approach, who haven’t yet let me down with the support I have required, in the timescale I’ve required and in particular, provide a Stainless Steel TIG Welding service, that in this location, is difficult to beat on quality and price.

Kevin Partington
Engineering & Facilities Manager
B3 International LTD

They have always shown an innovative approach to the problems we have presented to them and excelled in attaining a cost effective solution for our requirements.  This has generally enhanced our standing with our customers and improved the goods and services we offer.

B. Conlan
Northern Area Fleet Engineer
Securicor Omega Logistics

Holden’s have completed two installations at Garth boiler house and I can say that both jobs have been completed on time and to the highest professional standards, their work and tradesmen are top quality.  I would have no reservations in using Holden’s again.

Kevin Gore
Wymott Works Department
HMP Garth

The service provided has always been first class with minimum supervision.  There have been no recorded safety incidents involving Holden’s personnel or installed equipment.  Holden’s are held in high regard by K.C Flint Site Engineering and I would not hesitate to recommend them for any mechanical engineering contract appropriate to their area of expertise.

Andrew Francis & Kimberly Clark
Flint Site Mechanical / Control Engineer
K.C Flint Site Engineering
Quick Contact

0 / 180

I consent to the processing and storage of my personal data

Latest News

A Detailed Look at Industrial Pipework Systems and Their Importance

8 December 2025

How Coded Welding Supports Industrial Safety and System Reliability

12 November 2025

The Importance of Precision Fabrication in Modern Engineering

15 October 2025

Pressure Tank Design

9 September 2025

Vertical Pressure Tanks

13 August 2025

© Copyright 2026 Holden’s CVE Limited

  • Privacy & Cookie Policy
  • Website Terms & Conditions

Unit 19 Centurion Way Industrial Estate, Centurion Way, Farington, Leyland, Lancashire, PR25 4GU

Digital Marketing Agency Lancashire

This website uses cookies to improve your experience. If you continue to use this site, you agree with our Privacy & Cookie Policy