Holden's Engineering Logo
+44 1772 621010
info@holdensengineering.co.uk
  • Home
  • Our Services
    • Engineering
      • Engineering Companies
      • Engineering Companies Lancashire
      • Bridge Engineering
      • Vehicle Engineering
    • Fabrication
      • Heavy Fabrication
      • Plate Work
      • Stainless Steel Fabrication
      • Welding Services
      • Prefabricated Pipe Work
    • Pre-packaged Plant Rooms
    • Plant & Process Engineering
      • Fork Lift Repairs & Modifications
      • Lifting Applications
      • Plant Manufacturing
      • Plant Modifications
      • Reach Stacker Modifications
      • Specialist Bespoke Engineering
      • Structures
      • Turnkey Projects
      • Weighing System Modifications
    • Pressure Vessels
      • Pressure Vessel Testing
      • Pressure Vessel Inspections
      • Pressure Vessel Design
      • Pressure Vessel Fabrication
      • Pressure Vessel Installation
    • Pipe Fabricators
      • Prefabricated Pipe Work
    • Machining
    • Site Services
    • Valves
  • Sectors
    • Aerospace Engineering UK
    • Chemical Processing UK
    • Drinks & Brewing
    • Food Processing
    • General Manufacturing
    • Hazardous Areas
    • Health and Hospitals
    • Railway
    • Recycling and Waste Management
    • Nuclear and Power
    • Oil and Gas
    • Paper and Pulp
    • Public Sector
    • Pharmaceutical
  • About Us
  • Portfolio
  • Quality Assurance
  • News
  • Contact Us
+44 1772 621010

News

Home
Holden's News
Negotiations Continuing Over Swansea Tidal Power Project
Holden's News
8 years ago
Holden's CVE Limited

Negotiations Continuing Over Swansea Tidal Power Project

Negotiations between the English and Welsh governments over the Swansea tidal lagoon power project have gathered pace.

The Independent reported that the two sides are exploring the possibility of using a plan similar to that used to fund the Hinkley Point nuclear power plant project.

Initially, Tidal Lagoon Power – the developer for the Swansea Bay scheme – had proposed selling the energy at a price that was a third higher than that offered by Hinkley Point. However, ministers are now in talks to offer a deal whereby power will be provided for the same price as the nuclear plant.

The Welsh Government has been working hard to ensure that the project goes ahead and that a deal can be reached with the developer that will work for everyone.

If the scheme is constructed, it will be the first tidal lagoon power plant in the world, and will be capable of generating enough electricity to power 155,000 homes for 120 years, Tidal Lagoon Power states.

The organisation notes that construction is expected to take four years and, according to its website, it is hoping to start this work in 2018. The economic benefits for the Welsh economy are substantial, and it is expected to generate £316 million gross added value during construction, with £76 million in each year it’s operational.

Many MPs on the back benches are in favour of the project getting started, because of the benefit it will bring to the UK’s economy as a whole, not just Wales, during its construction.

For such a specialist development, the firm will no doubt be using bespoke engineering services  – if you need help with a project that’s unique or unusual, contact us to find out how we could help.

Next Post
Manufacturing Sector Accounts for 23% Of UK GDP
Previous Post
Employment Rate Continues to Grow

Related Posts

Holden's News

A Detailed Look at Industrial Pipework Systems and Their Importance

8 December 2025
digital@piranha-solutions.com
Pipework forms the backbone of many industrial processes. It transports steam, water, chemicals, air and product flow across sites that…
Read more
Holden's News

How Coded Welding Supports Industrial Safety and System Reliability

12 November 2025
digital@piranha-solutions.com
Coded welding is a critical skill within industrial engineering. It demands formal qualification, strict process control and continuous attention to…
Read more

Latest News

A Detailed Look at Industrial Pipework Systems and Their Importance

8 December 2025

How Coded Welding Supports Industrial Safety and System Reliability

12 November 2025

The Importance of Precision Fabrication in Modern Engineering

15 October 2025

Pressure Tank Design

9 September 2025

Vertical Pressure Tanks

13 August 2025

What Factors Influence Pressure Vessel Design

15 July 2025

Post Categories

  • Holden's News

Post Archives

  • December 2025
  • November 2025
  • October 2025
  • September 2025
  • August 2025
  • July 2025
  • June 2025
  • August 2024
  • June 2019
  • May 2019
  • March 2019
  • November 2018
  • September 2018
  • August 2018
  • July 2018
  • June 2018
  • May 2018
  • April 2018
  • March 2018
  • February 2018
  • January 2018
  • December 2017
  • August 2016

Now you’ve seen what we can do…

Get in Touch
Accreditations
ISOQAR icon
Safecontractor logo
RISQS logo
CHAS logo
CE logo
Testimonials

We have used Holden’s as our main mechanical contractor for over 30 years.  Being a chemical manufacturer it is very important that any contracting company working on site has full knowledge of all current HSE and Environmental requirements and we have always found Holden’s to be very diligent in this area.  I would have no hesitation in recommending Holden’s to any company that require the services they have to offer.

Barrie Simmonds
Works Director
Chemical Innovations Limited

Preston Pharmaceuticals Production Unit is part of the Royal Preston Hospital.  Holden’s have always given us a first class service, offering advice from their very knowledgeable and friendly staff.  The equipment is machined to a very high standard, turnover and delivery is quick and efficient.

Adam Fleming
Production Manager
Preston Pharmaceuticals

Having developed a great working relationship with Les and his team over the past 3 years, I have no hesitation in recommending them to anyone who looks for a company with a highly professional approach, who haven’t yet let me down with the support I have required, in the timescale I’ve required and in particular, provide a Stainless Steel TIG Welding service, that in this location, is difficult to beat on quality and price.

Kevin Partington
Engineering & Facilities Manager
B3 International LTD

They have always shown an innovative approach to the problems we have presented to them and excelled in attaining a cost effective solution for our requirements.  This has generally enhanced our standing with our customers and improved the goods and services we offer.

B. Conlan
Northern Area Fleet Engineer
Securicor Omega Logistics

Holden’s have completed two installations at Garth boiler house and I can say that both jobs have been completed on time and to the highest professional standards, their work and tradesmen are top quality.  I would have no reservations in using Holden’s again.

Kevin Gore
Wymott Works Department
HMP Garth

The service provided has always been first class with minimum supervision.  There have been no recorded safety incidents involving Holden’s personnel or installed equipment.  Holden’s are held in high regard by K.C Flint Site Engineering and I would not hesitate to recommend them for any mechanical engineering contract appropriate to their area of expertise.

Andrew Francis & Kimberly Clark
Flint Site Mechanical / Control Engineer
K.C Flint Site Engineering
Quick Contact

0 / 180

I consent to the processing and storage of my personal data

Latest News

A Detailed Look at Industrial Pipework Systems and Their Importance

8 December 2025

How Coded Welding Supports Industrial Safety and System Reliability

12 November 2025

The Importance of Precision Fabrication in Modern Engineering

15 October 2025

Pressure Tank Design

9 September 2025

Vertical Pressure Tanks

13 August 2025

© Copyright 2026 Holden’s CVE Limited

  • Privacy & Cookie Policy
  • Website Terms & Conditions

Unit 19 Centurion Way Industrial Estate, Centurion Way, Farington, Leyland, Lancashire, PR25 4GU

Digital Marketing Agency Lancashire

This website uses cookies to improve your experience. If you continue to use this site, you agree with our Privacy & Cookie Policy