Holden's Engineering Logo
+44 1772 621010
info@holdensengineering.co.uk
  • Home
  • Our Services
    • Engineering
      • Engineering Companies
      • Engineering Companies Lancashire
      • Bridge Engineering
      • Vehicle Engineering
    • Fabrication
      • Heavy Fabrication
      • Plate Work
      • Stainless Steel Fabrication
      • Welding Services
      • Prefabricated Pipe Work
    • Pre-packaged Plant Rooms
    • Plant & Process Engineering
      • Fork Lift Repairs & Modifications
      • Lifting Applications
      • Plant Manufacturing
      • Plant Modifications
      • Reach Stacker Modifications
      • Specialist Bespoke Engineering
      • Structures
      • Turnkey Projects
      • Weighing System Modifications
    • Pressure Vessels
      • Pressure Vessel Testing
      • Pressure Vessel Inspections
      • Pressure Vessel Design
      • Pressure Vessel Fabrication
      • Pressure Vessel Installation
    • Pipe Fabricators
      • Prefabricated Pipe Work
    • Machining
    • Site Services
    • Valves
  • Sectors
    • Aerospace Engineering UK
    • Chemical Processing UK
    • Drinks & Brewing
    • Food Processing
    • General Manufacturing
    • Hazardous Areas
    • Health and Hospitals
    • Railway
    • Recycling and Waste Management
    • Nuclear and Power
    • Oil and Gas
    • Paper and Pulp
    • Public Sector
    • Pharmaceutical
  • About Us
  • Portfolio
  • Quality Assurance
  • News
  • Contact Us
+44 1772 621010

News

Home
Holden's News
“National mission required if government is to deliver clean power by 2030”
Holden's News
2 years ago
Holdens

“National mission required if government is to deliver clean power by 2030”

National mission required if government is to deliver clean power by 2030, says National Engineering Policy Centre

Compiled by an independent working group led by the Royal Academy of Engineering, Rapid Decarbonisation of the GB Electricity System highlights the need for government to clearly set out the value of this target as a national mission, in a similar way to the work of the vaccines task force.

23 July 2024
Share this:

 

WhatsApp Twitter LinkedIn Facebook Email

A radical approach is required from government to drive the major infrastructure and system transformation needed to decarbonise the GB electricity system and provide clean power by 2030, according to a new report from the National Engineering Policy Centre (NEPC). This includes recommendations for delivering the required grid, generation and system flexibility under an accelerated timescale.

Compiled by an independent working group led by the Royal Academy of Engineering, Rapid Decarbonisation of the GB Electricity System highlights the need for government to clearly set out the value of this target as a national mission, in a similar way to the work of the vaccines task force.

The National Engineering Policy Centre report sets out six key elements required in the government’s delivery plan to achieve its clean power mission, which should be central to its Industrial Strategy:

  • Building strong support for the vision, to form the basis of an enduring agreement with both the public and industry and help them to embrace the coming changes;
  • Strong central leadership and governance with engineering at the forefront, accountable to the Prime Minister;

Read more

Explore the new report

Topic: Electricity decarbonisation in the UK 

For more information please contact Lorrie Fay

Lorrie Fay
lorrie.fay@raeng.org.uk020 7766 0729
  • A digitally enabled system that allows the public to engage with the system more flexibly, benefiting grid operation and saving consumers and government money;
  • A front-foot approach to procurement and regulation to ensure the UK can get ahead in the global race to decarbonise electricity;
  • Tackle difficult decisions on planning, consenting and connection delays while building public support;
  • Retain a long-term view to ensure that the intense focus on delivery towards 2030 does not delay near-term actions needed to unlock the best options for post-2030.

Delivery of a highly decarbonised electricity system by 2030 will require a sharp increase in offshore wind capacity, says the report, as well as ensuring delivery of the transmission network that is already in train, and expanding onshore wind and solar generation, particularly in places where the grid already has capacity to accept new generation.

Government will also need to engage with domestic, commercial and industrial electricity users to unlock the potential for demand to be shifting to the times when wind and solar generation is highest, as well as storing electricity to smooth supply through a portfolio of storage solutions.

Anticipatory investment will be key to success, says the report, with new grid infrastructure and increased distribution capacity identified as central priorities to the 2030 mission. Difficult choices will need to be made to reduce the time taken to deliver new grid infrastructure and connect power generation assets. This will mean confronting new transmission timelines and planning, grid connection queue delays and supply chain constraints. Adding renewable capacity in locations that can be readily accommodated without new power lines where possible and implementing a more proactive supply chain policy with clear signals to investors, are both identified as potential solutions.

Beyond 2030, the NEPC report highlights changes to a future energy system that cannot be delivered before 2030 but require action this decade. These include:

  • Achieving progress on hydrogen storage and transmission;
  • Greenlighting and expanding carbon capture and storage projects and related CO2 transport and storage;
  • Investing significantly in the distribution network to manage further electrification of heat and transport;
  • Further expansion of generation, including nuclear projects and potentially including a broader range of renewables such as tidal;
  • A national engineering and technology workforce strategy to address skills deficits in the short and long term, including the need for an additional 200,000 engineers and technicians working in the energy sector by 2030

 

Professor Sir Jim McDonald GBE FREng FRSE, President of the Royal Academy of Engineering, said:

“There is no time to waste in delivering progress towards this crucial aspect of a net zero energy system. Decarbonising electricity production, transmission and utilisation under an accelerated timeline, will not only provide societal benefits through an energy system that is less vulnerable to global disruption, but will also create an economic and competitive opportunity for the UK to lead on the infrastructure, technology and engineering skills that will shape the future.”

 

Dr Simon Harrison FREng CEng FIET FEI, co-chair of the independent working group and Group Head of Strategy at Mott MacDonald, said:

“The scale of work required to decarbonise the electricity system in such a short period of time cannot be underestimated. But the precedent set by the rapid delivery of the Covid-19 vaccine shows that the collective pursuit of a national mission can put a seemingly impossible target within reach. A radical shift in our approach will be needed, but the engineering community has already come together to map that out in this report, and it is ready to roll up its sleeves to deliver the clean energy we need.”

 

Dame Dervilla Mitchell DBE FREng CEng MICE MIStructE, Director, Arup Group, said:

“Transforming the UK’s electricity grid to provide 100% clean power will require strong leadership in both engineering and in government, working together towards this critical mission. Although there will be technical issues to address, wider concerns such as clarity of ambition, governance, risk allocation and supply chain capacity are the issues most likely to impact the transition of the energy system to 2030 and beyond.”

 

Professor Nilay Shah OBE FREng CEng FIChemE, Professor of Process Systems Engineering, Imperial College London, said:

“It will be important to develop a strategic plan from which other key decisions will flow. These key decisions include deciding where new infrastructure and assets will be, as well as supply chain and procurement planning. It will also include the development of a digital strategy to support roll out and real time operation of the system, and ensuring consistency with the interventions which will be needed in the following decades.”


Notes for editors

  1. The work contained in this report has been overseen by an expert working group drawn from the National Engineering Policy Centre (NEPC), led by the Royal Academy of Engineering, and is based on an intensive period of stakeholder engagement and literature review undertaken between February and June 2024. The work has been informed by a dedicated roundtable with engineering industry leaders convened by the Institution of Civil Engineers (ICE), input from the Institution of Engineering and Technology (IET) and a series of five NEPC roundtables which pre-dated the change to a 2030 target.
  2. The Rapid decarbonisation of the GB electricity system policy project was supported by a grant from the Gatsby Charitable Foundation and delivered under the direction of a National Engineering Policy Centre Working Group made up of the following experts:

Dr Simon Harrison FREng CEng FIET FEI, Group Head of Strategy, Mott MacDonald (Chair)

Sir Patrick Vallance KCB HonFREng FRS FMedSci (Co-chair to July 5, 2024)

Professor Nilay Shah OBE FREng CEng FIChemE, Professor of Process Systems Engineering, Imperial College London

Dr Cathy McClay OBE FREng CEng FIET, Independent Expert

Jo Coleman OBE FIMechE, Independent Expert

Dame Dervilla Mitchell DBE FREng CEng MICE MIStructE, Director for Arup Group

Dr David Wright FREng FIET MIGEM, Group Chief Engineer, National Grid

David Waboso CBE FREng CEng FICE FIRSE, Independent Non-Executive Director, Sizewell C & Hinkley Point C

Dr Graham Oakes CEng CITP FBCS Independent Expert in Local, Community and Municipal Energy

Ian Funnell FREng CEng FIET, Chair, National Nuclear Laboratory

Nick Winser CBE FREng CEng FEI FIET FIGEM, Independent Expert

 

  1. The National Engineering Policy Centre previously published a framework for rapid low regrets decision making for net zero policy to assist policymakers: https://nepc.raeng.org.uk/policy-work/net-zero/rapid-low-regrets-decision-making-for-net-zero-policy
  2. The National Engineering Policy Centrebrings engineering thinking to the heart of policymaking, creating positive impacts for society. We are a partnership of 42 professional engineering organisations that cover the breadth and depth of our profession, led by the Royal Academy of Engineering. Together we provide insights, advice, and practical policy recommendations on complex national and global challenges.
  3. The Royal Academy of Engineering is harnessing the power of engineering to build a sustainable society and an inclusive economy that works for everyone.
    In collaboration with our Fellows and partners, we’re growing talent and developing skills for the future, driving innovation and building global partnerships, and influencing policy and engaging the public. Together we’re working to tackle the greatest challenges of our age.
Next Post
BP Signs Multi-Million Pound Design and Engineering Contracts for H2Teesside
Previous Post
Scotland’s New Underwater Engineering Base is Set to Launch the UK to the Forefront of ‘Blue Economy’

Related Posts

Holden's News

A Detailed Look at Industrial Pipework Systems and Their Importance

8 December 2025
digital@piranha-solutions.com
Pipework forms the backbone of many industrial processes. It transports steam, water, chemicals, air and product flow across sites that…
Read more
Holden's News

How Coded Welding Supports Industrial Safety and System Reliability

12 November 2025
digital@piranha-solutions.com
Coded welding is a critical skill within industrial engineering. It demands formal qualification, strict process control and continuous attention to…
Read more

Latest News

A Detailed Look at Industrial Pipework Systems and Their Importance

8 December 2025

How Coded Welding Supports Industrial Safety and System Reliability

12 November 2025

The Importance of Precision Fabrication in Modern Engineering

15 October 2025

Pressure Tank Design

9 September 2025

Vertical Pressure Tanks

13 August 2025

What Factors Influence Pressure Vessel Design

15 July 2025

Post Categories

  • Holden's News

Post Archives

  • December 2025
  • November 2025
  • October 2025
  • September 2025
  • August 2025
  • July 2025
  • June 2025
  • August 2024
  • June 2019
  • May 2019
  • March 2019
  • November 2018
  • September 2018
  • August 2018
  • July 2018
  • June 2018
  • May 2018
  • April 2018
  • March 2018
  • February 2018
  • January 2018
  • December 2017
  • August 2016

Now you’ve seen what we can do…

Get in Touch
Accreditations
ISOQAR icon
Safecontractor logo
RISQS logo
CHAS logo
CE logo
Testimonials

We have used Holden’s as our main mechanical contractor for over 30 years.  Being a chemical manufacturer it is very important that any contracting company working on site has full knowledge of all current HSE and Environmental requirements and we have always found Holden’s to be very diligent in this area.  I would have no hesitation in recommending Holden’s to any company that require the services they have to offer.

Barrie Simmonds
Works Director
Chemical Innovations Limited

Preston Pharmaceuticals Production Unit is part of the Royal Preston Hospital.  Holden’s have always given us a first class service, offering advice from their very knowledgeable and friendly staff.  The equipment is machined to a very high standard, turnover and delivery is quick and efficient.

Adam Fleming
Production Manager
Preston Pharmaceuticals

Having developed a great working relationship with Les and his team over the past 3 years, I have no hesitation in recommending them to anyone who looks for a company with a highly professional approach, who haven’t yet let me down with the support I have required, in the timescale I’ve required and in particular, provide a Stainless Steel TIG Welding service, that in this location, is difficult to beat on quality and price.

Kevin Partington
Engineering & Facilities Manager
B3 International LTD

They have always shown an innovative approach to the problems we have presented to them and excelled in attaining a cost effective solution for our requirements.  This has generally enhanced our standing with our customers and improved the goods and services we offer.

B. Conlan
Northern Area Fleet Engineer
Securicor Omega Logistics

Holden’s have completed two installations at Garth boiler house and I can say that both jobs have been completed on time and to the highest professional standards, their work and tradesmen are top quality.  I would have no reservations in using Holden’s again.

Kevin Gore
Wymott Works Department
HMP Garth

The service provided has always been first class with minimum supervision.  There have been no recorded safety incidents involving Holden’s personnel or installed equipment.  Holden’s are held in high regard by K.C Flint Site Engineering and I would not hesitate to recommend them for any mechanical engineering contract appropriate to their area of expertise.

Andrew Francis & Kimberly Clark
Flint Site Mechanical / Control Engineer
K.C Flint Site Engineering
Quick Contact

0 / 180

I consent to the processing and storage of my personal data

Latest News

A Detailed Look at Industrial Pipework Systems and Their Importance

8 December 2025

How Coded Welding Supports Industrial Safety and System Reliability

12 November 2025

The Importance of Precision Fabrication in Modern Engineering

15 October 2025

Pressure Tank Design

9 September 2025

Vertical Pressure Tanks

13 August 2025

© Copyright 2026 Holden’s CVE Limited

  • Privacy & Cookie Policy
  • Website Terms & Conditions

Unit 19 Centurion Way Industrial Estate, Centurion Way, Farington, Leyland, Lancashire, PR25 4GU

Digital Marketing Agency Lancashire

This website uses cookies to improve your experience. If you continue to use this site, you agree with our Privacy & Cookie Policy