Holden's Engineering Logo
+44 1772 621010
info@holdensengineering.co.uk
  • Home
  • Our Services
    • Engineering
      • Engineering Companies
      • Engineering Companies Lancashire
      • Bridge Engineering
      • Vehicle Engineering
    • Fabrication
      • Heavy Fabrication
      • Plate Work
      • Stainless Steel Fabrication
      • Welding Services
      • Prefabricated Pipe Work
    • Pre-packaged Plant Rooms
    • Plant & Process Engineering
      • Fork Lift Repairs & Modifications
      • Lifting Applications
      • Plant Manufacturing
      • Plant Modifications
      • Reach Stacker Modifications
      • Specialist Bespoke Engineering
      • Structures
      • Turnkey Projects
      • Weighing System Modifications
    • Pressure Vessels
      • Pressure Vessel Testing
      • Pressure Vessel Inspections
      • Pressure Vessel Design
      • Pressure Vessel Fabrication
      • Pressure Vessel Installation
    • Pipe Fabricators
      • Prefabricated Pipe Work
    • Machining
    • Site Services
    • Valves
  • Sectors
    • Aerospace Engineering UK
    • Chemical Processing UK
    • Drinks & Brewing
    • Food Processing
    • General Manufacturing
    • Hazardous Areas
    • Health and Hospitals
    • Railway
    • Recycling and Waste Management
    • Nuclear and Power
    • Oil and Gas
    • Paper and Pulp
    • Public Sector
    • Pharmaceutical
  • About Us
  • Portfolio
  • Quality Assurance
  • News
  • Contact Us
+44 1772 621010

News

Home
Holden's News
Government to Invest Millions in Independent Satellite System
Holden's News
8 years ago
Holden's CVE Limited

Government to Invest Millions in Independent Satellite System

The government has announced plans for an 18-month study that will see £92 million allocated from the £3 billion Brexit readiness fund to develop an independent satellite system, with the UK Space Agency leading the work alongside the Ministry of Defence.

A British Global Navigation Satellite System is now being considered, which would aim to meet the country’s security requirements and support its sovereign space and cryptography sectors. The engineering, design and development project will provide both civilian and encrypted signals, while being compatible with the US GPS system as well.

Satnav systems like GPS are becoming increasingly important for military, commercial and other critical applications, whether it’s guiding aircraft and ships to helping millions find their way as they drive from A to B. Government research suggests that sustained disruption to satellite navigation would cost our economy £1 billion a day.

The study will inform the decision to create a new system as an alternative to Galileo, a global navigation satellite system created by the European Union that aims to provide an independent positioning system so that EU nations don’t have to rely on US, Chinese or Russian systems which could be disabled by their operators at any time.

Greg Clark, business secretary, commented on the news, saying: “Britain is a world leader in the space industry and satellites. We are investing in an alternative option to Galileo to ensure our future security needs are met using the UK’s world-leading space sector.

“Our position on Galileo has been consistent and clear. We have repeatedly highlighted the specialist expertise we bring to the project and the risks in time delays and cost increases that the European Commission is taking by excluding UK industry.

“Britain has the skills, expertise and commitment to create our own sovereign satellite system and I am determined that we take full advantage of the opportunities this brings, backed by our modern Industrial Strategy.”

This comes after a new National Aerospace Research Consortium was launched, with the aim being to set up a nationwide infrastructure of integrated and accessible research facilities to support four pillars of technology: aircraft of the future, future propulsion, smart, connected and electric aircraft of the future, and aero structures of the future.

And Theresa May also recently pledged additional investment for the aerospace industry, offering more than £300 million of industry and government money for several projects, including research on more environmentally friendly aircraft.

Speaking at the Farnborough Airshow, she went on to say that her plan for Brexit would also secure millions of sector jobs here in the UK.

Funding is also set to be made available for two new spaceports, one in Cornwall and one in Scotland. Not only that but a commitment has been made to build a new high-tech fighter aircraft set that’s designed to replace the Eurofighter Typhoon.

For help and advice relating to aerospace engineering in the UK, get in touch with us today.

Next Post
Oil and Gas Industry ‘Needs to Embrace Digital Technology’
Previous Post
UK Industry Fails to Attract Young Engineers

Related Posts

Holden's News

A Detailed Look at Industrial Pipework Systems and Their Importance

8 December 2025
digital@piranha-solutions.com
Pipework forms the backbone of many industrial processes. It transports steam, water, chemicals, air and product flow across sites that…
Read more
Holden's News

How Coded Welding Supports Industrial Safety and System Reliability

12 November 2025
digital@piranha-solutions.com
Coded welding is a critical skill within industrial engineering. It demands formal qualification, strict process control and continuous attention to…
Read more

Latest News

A Detailed Look at Industrial Pipework Systems and Their Importance

8 December 2025

How Coded Welding Supports Industrial Safety and System Reliability

12 November 2025

The Importance of Precision Fabrication in Modern Engineering

15 October 2025

Pressure Tank Design

9 September 2025

Vertical Pressure Tanks

13 August 2025

What Factors Influence Pressure Vessel Design

15 July 2025

Post Categories

  • Holden's News

Post Archives

  • December 2025
  • November 2025
  • October 2025
  • September 2025
  • August 2025
  • July 2025
  • June 2025
  • August 2024
  • June 2019
  • May 2019
  • March 2019
  • November 2018
  • September 2018
  • August 2018
  • July 2018
  • June 2018
  • May 2018
  • April 2018
  • March 2018
  • February 2018
  • January 2018
  • December 2017
  • August 2016

Now you’ve seen what we can do…

Get in Touch
Accreditations
ISOQAR icon
Safecontractor logo
RISQS logo
CHAS logo
CE logo
Testimonials

We have used Holden’s as our main mechanical contractor for over 30 years.  Being a chemical manufacturer it is very important that any contracting company working on site has full knowledge of all current HSE and Environmental requirements and we have always found Holden’s to be very diligent in this area.  I would have no hesitation in recommending Holden’s to any company that require the services they have to offer.

Barrie Simmonds
Works Director
Chemical Innovations Limited

Preston Pharmaceuticals Production Unit is part of the Royal Preston Hospital.  Holden’s have always given us a first class service, offering advice from their very knowledgeable and friendly staff.  The equipment is machined to a very high standard, turnover and delivery is quick and efficient.

Adam Fleming
Production Manager
Preston Pharmaceuticals

Having developed a great working relationship with Les and his team over the past 3 years, I have no hesitation in recommending them to anyone who looks for a company with a highly professional approach, who haven’t yet let me down with the support I have required, in the timescale I’ve required and in particular, provide a Stainless Steel TIG Welding service, that in this location, is difficult to beat on quality and price.

Kevin Partington
Engineering & Facilities Manager
B3 International LTD

They have always shown an innovative approach to the problems we have presented to them and excelled in attaining a cost effective solution for our requirements.  This has generally enhanced our standing with our customers and improved the goods and services we offer.

B. Conlan
Northern Area Fleet Engineer
Securicor Omega Logistics

Holden’s have completed two installations at Garth boiler house and I can say that both jobs have been completed on time and to the highest professional standards, their work and tradesmen are top quality.  I would have no reservations in using Holden’s again.

Kevin Gore
Wymott Works Department
HMP Garth

The service provided has always been first class with minimum supervision.  There have been no recorded safety incidents involving Holden’s personnel or installed equipment.  Holden’s are held in high regard by K.C Flint Site Engineering and I would not hesitate to recommend them for any mechanical engineering contract appropriate to their area of expertise.

Andrew Francis & Kimberly Clark
Flint Site Mechanical / Control Engineer
K.C Flint Site Engineering
Quick Contact

0 / 180

I consent to the processing and storage of my personal data

Latest News

A Detailed Look at Industrial Pipework Systems and Their Importance

8 December 2025

How Coded Welding Supports Industrial Safety and System Reliability

12 November 2025

The Importance of Precision Fabrication in Modern Engineering

15 October 2025

Pressure Tank Design

9 September 2025

Vertical Pressure Tanks

13 August 2025

© Copyright 2026 Holden’s CVE Limited

  • Privacy & Cookie Policy
  • Website Terms & Conditions

Unit 19 Centurion Way Industrial Estate, Centurion Way, Farington, Leyland, Lancashire, PR25 4GU

Digital Marketing Agency Lancashire

This website uses cookies to improve your experience. If you continue to use this site, you agree with our Privacy & Cookie Policy